Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.9527348
| No.9527348
- Product Categories
- Friendly Links
- home > Supply > Supply Liaoning lightning protection and grounding materials Chemical Ground Electrode 0 Lee Sales
| Information Name: | Supply Liaoning lightning protection and grounding materials Chemical Ground Electrode 0 Lee Sales |
| Published: | 2013-06-17 |
| Validity: | 300 |
| Specifications: | Complete |
| Quantity: | 10000.00 |
| Price Description: | |
| Detailed Product Description: | [Liaoning lightning protection and grounding materials Chemical Ground Electrode 0 Lee sales] Chemical Ground Electrode construction is simple - to be a large area of ??conventional ground operations, construction costs, Jeeves costs, broken road more costly. Field construction land tenure increased cost of compensation payments or cash crops, the product does not have the construction when the outdoor conditions, the lowest level in the building interior can also be installed using monopolar covers only 0.1m2, especially for the building dense use within the city. Additional engineering costs, long life, maintenance-free for 50 years. System equipped with two kinds of internal and external anion filling material, the external filler material has a strong suction force, strong adsorption and cation exchange high performance material as the main body, together with the long-term, lower resistance, anti-corrosion, strong function, high coefficient of expansion not temperature changes, high voltage shock a variety of chemical materials for accessories; excessive soil resistivity directly because of lack of free ions auxiliary conductive effect. Electric ion grounding Construction Guide: Step 1. Punch diameter of 0.15 m -0.20 m, depth of at least 3 meters; Step two Install the grounding electrode into the hole; Step three. Connection with the earth electrode connecting copper and Additional grounding connections, using fire penetration welding; Step Four. laying backfill backfill turn into water and, stirring, and after the electrolytic salt into the container, and backfill modulated into a paste, pour in the surrounding ground electrode voids; Step five. backfill first fill of fine soil layers and compacted. Company official website: http://www.ejiediji.com/ Mobile: 18713765028 18632765994 Tel 0317 -8349587 Fax 0317 -8302644 Contact: Chang Manager Address: Botou City Yuhua Road We have a number of highly qualified professional and technical talent and a skilled, experienced and tenacious style of the construction team, is committed to research and development of mine production, mine engineering design and construction. |
Admin>>>
You are the 10099 visitor
Copyright © GuangDong ICP No. 10089450, The Botou City Jinhao Yuan lightning Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 10099 visitor
Copyright © GuangDong ICP No. 10089450, The Botou City Jinhao Yuan lightning Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

